Full Bathroom Package

Estimated Time: 5 to 7 days, depending on the size and complexity of the remodel.

What's Included

  • Demolition: Removal of existing tub/shower, flooring, wall tiles, and other fixtures.

  • Wall Adjustments: Reconfiguration or minor adjustments to walls, as needed (depending on the project).

  • Tub or Shower Installation:

    • Install a new tub or shower (including walk-in showers or bath/shower combos).

    • Installation of custom wall surrounds, shower niches, and built-in shelving as needed.

  • Plumbing Adjustments: Replacing and upgrading plumbing fixtures, if necessary, to meet code and accommodate new installations.

  • One (1) Shower Fixture

  • Two (3) Grab Bars

  • One (2) Soap Dishes

  • One (1 ) Shower Rod

  • Flooring: Removal of old flooring and installation of new waterproof, slip-resistant flooring (luxury vinyl, tile, or other materials).

  • Toilet Installation: Removal of existing toilet and installation of a new or provided toilet.

  • Lighting Installation: Replacement or installation of new light fixtures and any necessary rewiring.

  • Paint & Finishing: Painting walls, trim, and ceilings as required.

  • Vanity Installation: While we do not supply the vanity or countertop, we will install customer-provided vanities, countertops, and fixtures.

  • Accessories & Hardware: Install towel bars, robe hooks, toilet paper holders, mirrors, and other accessories.

Shower and Floor Package


Estimated Time: 1 to 3 days, depending on the size and complexity of the remodel.

What's Included

  • Scope of Work

    • Shower Installation:

      Removal of existing shower/tub and installation of a new shower with custom wall surrounds and shelving.

    • Plumbing Adjustments: Adjustments or upgrades to shower plumbing fixtures.

    • One (1) Shower Fixture

    • Two (3) Grab Bars

    • One (2) Soap Dish

    • One (1 ) Shower Rod

    • Flooring: Installation of new waterproof, slip-resistant flooring (luxury vinyl or tile).

    • Trim Installation (Base Shoe Only)

    • Sealing & Waterproofing: Ensuring all seams and edges are properly sealed to prevent water damage.

Tub & Shower Conversion


Estimated Time: 1 to 3 days, depending on the size and complexity of the remodel.

What's Included

  • Scope of Work

    • Bathtub to Shower Conversion: Removal of existing tub and installation of a new shower with custom wall surrounds.

    • Shower to Bathtub Conversion: Removal of existing shower and installation of a new bathtub.

    • Plumbing Adjustments: Adjustments to accommodate new tub or shower.

    • Sealing & Waterproofing: Full waterproofing around all new installations to ensure longevity and prevent leaks.

    • One (1) Shower Fixture

    • Two (2) Grab Bars

    • One (1) Soap Dish

    • One (1 ) Shower Rod